Construction and Remodeling License in Colombia: Requirements, Types, and Procedure at the Curaduría
Before starting a renovation or adaptation on a property in Colombia, it is crucial to know if you require an urban planning license from the Curaduría. Check the requirements, modalities, and deadlines to avoid penalties.

IDIOMA DEL ARTÍCULO
Showing original language
Quick answer: If you plan to tear down structural walls, expand the built area, change the property's usage (for example, transforming a home into an office or commercial space), or modify the facade, you need a construction permit in the corresponding modality issued by an Urban Curator's Office or the competent municipal authority. However, locative repairs such as painting, changing floors, renovating internal networks, or replacing tile work do not require a prior urban planning permit.
Adjusting or remodeling a home, commercial space, or office is a common step before putting a property on the market or adapting it for a new venture. However, intervening in a property without knowing the legal framework of Decree 1077 of 2015 can lead to construction suspensions, special fines for urban planning violations, and even demolition orders. According to active listings on Colombia Move (August 2026), there are 6 office listings and 6 commercial space listings; this is a snapshot of available supply, not a price reference or a guarantee of contacts.
What is an urban planning permit and who issues it in Colombia?
An urban planning permit is the prior, formal, and explicit authorization issued by an urban curator or the competent municipal/district authority to carry out urbanization, parceling, subdivision, construction, or public space intervention works. Its purpose is to ensure that any physical intervention respects the municipality's Land Use Plan (POT) and the current building regulations.
In major Colombian cities, there are Urban Curator's Offices, which are private entities invested with public functions responsible for verifying the technical and legal conformity of projects. In municipalities where the position of urban curator does not exist, the process is handled directly through the Planning Secretariat or the department designated by the local mayor's office.
It is important to emphasize that before designing an expansion or a change of commercial use, you must verify the land classification and the permitted use for the area. To learn more about how urban planning determines the value and purpose of a property, you can read our guide on the Land Use Plan (POT) in Colombia.
Locative remodels vs. works requiring a permit

One of the most frequent errors among owners is assuming that every intervention requires a complex procedure at the curator's office, or conversely, believing that any internal work can be performed freely without permission. The Ministry of Housing establishes a clear limit based on the structural, spatial, and functional impact on the building.
The locative repairs or improvements are those intended to keep the property in healthy and hygienic conditions without altering its load-bearing structure, its interior distribution, or its functional, formal, or volumetric characteristics. These interventions do not require an urban planning permit.
| Type of intervention | Does it require a permit from the Curator's Office? | Typical examples |
|---|---|---|
| Locative repair | No permit required | Interior painting, changing floors, maintenance of bathrooms, and roof repair without changing structure, distribution, shape, or volume. |
| Expansion | Yes, a permit is required | Building an additional floor, enclosing an open terrace to create a bedroom, or increasing the square footage. |
| Modification | Yes, a permit is required | Tearing down load-bearing or partition walls to redistribute spaces, altering the facade, or moving the stairs. |
| Adequacy | Yes, a permit is required | Changing the use of the property, such as adapting a residential apartment to enable a doctor's office or workspace. |
| Structural reinforcement | Yes, a permit is required | Interventions on columns, beams, or foundations to comply with the NSR-10 earthquake resistance standards. |
Types and modalities of construction permits under Decree 1077
The Single Regulatory Decree 1077 of 2015 classifies permits into five major categories: urbanization, parceling, subdivision, construction, and public space intervention/occupation. For the remodeling or intervention of existing buildings, the construction permit is broken down into several specific modalities:
- New construction: Building from scratch on unbuilt land.
- Expansion: Increase in the built area of an existing building.
- Adequacy: Change of use for a building or part of it, ensuring the preservation of the original structures.
- Modification: Variation of the interior architectural or structural design without increasing the built area.
- Restoration: Works to recover or conserve a property of architectural or heritage importance.
- Structural reinforcement: Intervention to adapt the structure to seismic safety levels.
- Demolition: Total or partial teardown of a building (usually processed along with new construction or expansion).
- Enclosure: Permanent enclosure of a privately owned property.
In commercial or rural housing projects where interventions on water sources or rural adaptations are anticipated, it is relevant to review additional environmental regulations. You can consult our guide on groundwater concessions for farms to evaluate supplementary permits.
Requirements and documents for filing at the Urban Curator's Office
To proceed with a construction permit application or its modalities in Colombia, the applicant must present the set of normative documents provided for by Resolution 0462 of 2017 and its updates. The base list includes:
- Single National Form (FUN): Filled out and signed by the owner and the responsible professionals. Since March 2026, the Ministry of Housing requires the version with the updated graphic visual identity.
- Copy of the certificate of freedom and tradition: Recently issued, according to what is required by the competent authority for the procedure.
- Identity document: Owner's ID card or certificate of existence and legal representation if it is a legal entity.
- Copy of property tax receipt: Last receipt of the unified property tax showing the address and nomenclature.
- Architectural and structural plans: Signed by a registered architect and civil engineer with their respective professional validity.
- Structural calculation report: Soil study and supporting design reports when the modality requires it.
- List of neighbors: Names and addresses of the owners of properties adjacent to the construction site.
Step-by-step of the process, deadlines, and expense costs
The administrative procedure for issuing a building permit follows strict legal stages to ensure neighbor participation and technical review:
- Filing in due and proper form: Full submission of the FUN and attachments. The curaduría provides a filing record and sets the notice for neighbors.
- Technical and legal review: The curaduría's professionals analyze the project's compliance with the POT and building regulations.
- Record of observations and corrections: If there are technical objections or documents are missing, the curador issues a record granting a legal deadline to resolve them.
- Viability resolution and payment of expenses: Once the project is approved, the urban development taxes and the curador's expenses are calculated.
- Issuance of the permit: The administrative act authorizing the start of work is finalized and signed.
Legal timeframe: The urban curador or municipal authority has a maximum period of 45 business days counting from the filing in due and proper form to resolve the request. This term may be extended when the complexity of the file justifies it.
Costs and expenses: There is no single or arbitrarily fixed fee. The cost is calculated using the official expense formula regulated by the Superintendencia de Notariado y Registro and the Ministry of Housing. The final amount applies official charges and variables, including area, use, type, and values expressed in UVT; therefore, it is advisable to request the calculation for the specific file. It is key to note that in municipalities without an urban curador, the municipal authority is not authorized to charge expenses for the administrative license process.
Consequences of building or remodeling without a permit
Carrying out interventions that require a permit without prior authorization exposes the owner and the builder to corrective measures under the National Police and Coexistence Code and urban integrity regulations. Depending on the case, authorities may impose corrective measures such as construction suspension, special fines, or demolition; not all apply automatically.
Additionally, a non-legalized renovation can generate technical or documentary questions during a sale, appraisal, or subsequent procedure; confirm the case with the authority and the responsible professionals.
How to prepare your office or remodeled premises for rent or sale
If you have finished adapting a commercial space or remodeling an office, the next practical step is to market the space with transparency. Presenting clear information about the approved land use, the verified actual square footage, and technical specifications attracts serious clients and speeds up negotiations.
To explore housing options or evaluate commercial real estate offers, we invite you to check the housing and real estate section on Colombia Move.
Frequently asked questions
❓ What remodeling projects require a building permit in Colombia?
Building permits are required for renovations that involve an increase in square footage, modification of the load-bearing structure, interior layout changes that alter evacuation or spatial functionality, adaptation to a new use (e.g., from residential to commercial), or renovations that modify the property's façade.
❓ Does painting, changing floors, or remodeling a bathroom require a permit?
No, painting walls, changing floor or bathroom finishes, replacing sanitary fixtures, or maintaining internal utility networks are considered minor repairs (reparaciones locativas). Since they do not alter the structure, volume, or functional layout of the building, they do not require processing with the Curaduría Urbana.
❓ Where can I download the National Single Form (FUN) for the curaduría?
The National Single Form (FUN) is downloaded directly from the official website of the Ministry of Housing, City and Territory, or from the urban curaduría web portal of your jurisdiction. Remember to use the current official graphic version adjusted to existing regulations.
❓ How much does a building or remodeling permit cost?
The cost is variable and is determined by the legal expense formula set by the National Government. It depends on the surface area in square meters to be intervened, the socioeconomic stratum or use of the property (residential, office, commercial), and the UVT coefficients in force at the time of calculation.
❓ How long does a curaduría take to respond to the request?
The legal timeframe for the urban curador or municipal authority to resolve the request is 45 business days, starting from the complete filing in due and proper form. The authority may extend the term when the complexity of the file justifies it.
❓ What happens if I carry out work that required a permit without requesting it?
Carrying out work without the corresponding permit constitutes an urban planning violation. Local authorities can impose corrective measures ranging from the suspension of the work and special fines to the order of demolition of what was built illegally, and problems for the formal sale of the property.







Comments
Loading comments...
Checking sign-in status...